Regency to Pym
Early design optimisation helped set this project off in the right direction
Early design optimisation helped set this project off in the right direction
We helped early with the design process and contributed to many smart design features being adopted.
This project was a design and construct structural/mechanical scope with a tight timeline.
Transport of these 20+ items was the key to achieving a successful outcome.
Mechanical design to allow safe access to the train roof had to be correct.
The scope of the job included: Manufacture of production jigs and assembly and welding 140 units of each component.