Williams St Bridge
Precise timing to ensure mininal disruption to Melbourne Metro Rail
Precise timing to ensure mininal disruption to Melbourne Metro Rail
Design input & cost savings to client included recycled steel for temporary works
We helped early with the design process and contributed to many smart design features being adopted.
Adaptability and Compliance
Manufacture methodology was designed for efficiency to benefit our client.
ASKA is basically stage 1 of a potential “super radio telescope” funded by over 20 countries and larger and more sophisticated than ever before attempted.
Being a 1,200 tonne reaction frame this unit needed to be manufactured with the utmost focus on its structural integrity.
Supply, fabricate, surface treat, erect
Detailed site survey and accurate 3D drawings to match