Dorrien Bridge
Built Environs
2007
Shop Drawings, supply of 800WB members, fabrication, shear studs, surface preparation and treatment, transport to site
Lock 15 construction of a Fishway and modification of Navigable Pass
McConnell Dowell
2011 - 12
read more...
Clipper Ship Adelaide Transport Frame
Clipper Ship "City of Adelaide" Limited
2011
ASKA (Australian Square Kilometre Array)
RJE
Adelaide Aqua – Passivate Permeate Branches
McConnell Dowell (Abigroup ADP JV)
Christies Beach Desalination Plant
BMD
Vehicular Ferry Flaps (Aluminium)
DTEI
Driven pile reaction frame
2010
Alice Springs Aquatic Centre
Sitzler Brothers NT
Substation Upgrade
NEXY Pedestrian Bridge over the Gawler River
York Civil/Fulton Hogan
Ferry Crossing Extension Flaps
DTEI (Transport SA)
2009
Power Station Extension
Lock & Weir package 2, 4, 5, 6
York Civil (head client SA Water)
BHBP Olympic Dam Tails Leach Circuit Upgrade
Built Environs (head client BHP Billiton)
2008
Mindarie Sand Mine Drying Racks
Australian Zircon
CHAY Bulk Rail Carriage Component Manufacture
Bluebird Rail Operations
2007/2008
Mindarie Sand Mine PCP Plant structural steel
RJ Robbins (head client Australian Zircon)
2006/2007
Mosquito Creek Bridge
GK Structures
Riverbank Precinct Pedestrian Bridge
2004
Rocky River Visitor Information Centre
Chappell
2002
Berri Visitor Information Centre
Anton's Building
Tea Tree Gully Civic Centre
State Library
Flinders University - Carpark No. 5
2001